The Challenge

There were several challenges within this project, we had to work closely with the consultant to ensure our design met specification and did not cause any issues with other services on the roof space. During installation it became apparent that other services were impeding our installation area.

The Solution

SQ4S completed a design and build technical specification and completed a wind and point loading report for approval from the structural surveyor. We completed a full redesign and loading plan with the help of Sunfixings (mounting system manufacturer) within 24 hours and completed the project as per new design

The Result

Working closely with the consultant, SQ4S ensured that the project was completed to their specification and within budget. We also assisted with the DNO application which included the CHP system being included. Our vast experience and knowledge of working with the DNO’s ensured the clients received an exceptional service.